$214.50
$4.65
$7.22
Available on backorder
| SPECIFICATION: | |||
| MOQ: 100pcs | |||
| Size: 25x19x6cm (9.8×7.4×2.3inches) | |||
| Color: CMYK Mixed Color | |||
| Logo: Custom Print Logo | |||
| Design: Airplane Shape Double Sided Printing Shipping Box with Insert and Sleeve | |||
| Printing: Offset Printing on Both Inside and Outside and Insert and Sleeve | |||
| Material: 250gsm White Board + E-flute + 250gsm White Board + 350gsm White Card | |||
| Surface Finish: Matte Lamination on Both Inside and Outside | |||
| Sample: Available | |||
| Remark: If you need custom size, color, or crafts, please contact us for a final quote. |
Application: Toy, Skin Care, Cosmetic, Candle
Stock: No stock for customization
Production Time: 15 days
Shipping Period:
3-7 Days for Express
25-45 Days for Sea Shipping
Reference Weight:
37kg for 100 pieces
179kg for 500 pieces
This toy packaging is a DIY robot packaging and shipping box. It features a corrugated cardboard lining to securely hold the product and prevent damage from collisions and drops. The outer packaging includes a custom cardboard sleeve, designed to create limited edition packaging for different holidays and seasons.
If your product doesn’t require basic packaging, or if you have a limited budget and need a single box that serves as both basic packaging and a shipping container, you can consider this corrugated cardboard shipping box. Both the inside and outside of the box can be printed, allowing you to display product and company information, as well as instructions for use, directly on the packaging. This not only saves on custom packaging costs but also effectively communicates all necessary information to the consumer.
The price of this product includes not only the corrugated shipping box of the corresponding size, but also the cost of the custom corrugated insert and cardboard sleeve. If you do not require the insert and sleeve, please contact us for an accurate quote.
1. We are honored to offer you samples, usually we will finish them in 3-7 working days
2. The lead time for mass production depend on your orders quantity, finishing, etc., usually 10-25 days.